top of page

Eurotek Spiral Refurbishment

Real Engineering are currently undertaking a complete spiral overhaul to a 1992 52" Eurotek spiral freezer .

The works are for a large bakery group in the North of England 

The scope of works consisted of the following; 

  • Alterations from a "down go " to "up go" spiral 

  • Increasing the tier pitch to suit new product

  • Extending spiral columns to facilitate the larger tier pitch

  • Extending the drum

  • Changing the spiral orientation to suit customer requirements 

  • Design & manufacture new upper open deck

  • Installation of new enclosure 

  • Modifications to control panel to comply with current regulations 

  • New lubx rail supports

  • New drumbars 

  • Installation and commissioning 

bottom of page